Utilities Home | Utilities Dept. Site Map | Township Sewer System | Sewer GIS Map | Sewer Emergencies| Sewer Connection Applications | Sewer Connection Policies and Procedures | Grinder Pumps | Grinder Pump Alarms | Sewer Contractors | Roads and Road Maintenance | Municipal Utilities Committee | Livingston Community Water Authority | Portage-Base Lakes Sewer Authority

Last Updated
Thursday, April 28, 2011
Hamburg Township
Web Questions? E-mail: brichardson@hamburg.mi.us.

 

POLICIES AND PROCEDURES FOR SEWER CONNECTION

NOTE: All homes and business establishments with sewer service are required by Hamburg Township Ordinance to use potassium chloride in water softeners. Sodium chloride is prohibited.

POLICY #1

1. In the event a property is within 400 feet of an existing sewer line, the owner shall be permitted to make an application for an immediate connection together with the $200.00 non-refundable application fee. A Cost estimate will be prepared by Hamburg Township to complete the connection and submitted to the property owner. The property owner, upon payment of all costs estimated to complete the connection, would then be scheduled for construction of the connection to the Hamburg Township Sanitary Sewer System (HTSSS).

2. In the event that the sewer connection application submitted by the property owners is for a new home to be constructed in Hamburg Township, a Land Use permit will not be issued until such time as the Agreement for Sewer Connection has been signed by the property owner(s) and all estimated fees for connection have been paid in full.

3. In the event that the hook-up to the HTSSS can be made by connecting into an existing curb stop with check valve, the property owner shall have the option to hire a township approved Contractor to complete the sewer connection, provided that the Contractor used is on the Township’s approved list or who can qualify for training, at the contractor’s own expense, with the Township Engineer and DPW Field Superintendent.

4. The Utilities Department will also provide the property owner with the cost for sewer connection under the Township’s Blanket Pricing Contract for a cost comparison. If the property owner chooses to hire a township approved Contractor to complete the sewer connection, the owner will be required to provide a signed Agreement Regarding Use of Approved Contractor for Sewer Connection guaranteeing the use of an approved contractor prior to receiving final approval of the sewer connection.

5. If it is determined by the DPW Field Superintendent or Township Engineer that the sewer connection will require tapping into a live sewer main or transmission line, the Township will complete the sewer connection using the Township Contractor under the Blanket Pricing Contract.

6. In the event a property owner experiences a failed septic system, has completed steps 1 – 7 of the Hamburg Township Policies and Procedures for the Establishment of Contract Special Assessment Districts, and qualifies under the Hardship rules established by the Board of Trustees, then the Municipal Utilities Committee may recommend an advance of funds for an early hookup, provided the cost to complete an individual hookup does not exceed $15,000 and all costs associated with all early connections not yet funded through a bond issue does not exceed $100,000. Final approval of subject advance shall lie with the Board of Trustees.

7. Connections to the Sewer System other than as specifically described in paragraphs 1 and 2 above, must first be approved by the Municipal Utilities Committee of the Board of Trustees. If approved by the Municipal Utilities Committee then such application shall be submitted to the Board of Trustees for who may grant final approval.

 

- Adopted by Board of Trustees May 21, 2003

 

 

 

 

 

 

 

SWIRL1UTILITIES DEPARTMENT
HAMBURG TOWNSHIP

10405 Merrill Road
P.O. Box 157
Hamburg, MI 48139
Hours: Monday-Friday
8:00 a.m. to 5:00 p.m.

UTILITIES COORDINATOR:
Brittany K. Campbell
E-mail: bcampbell@hamburg.mi.us

Waste Water Treatment Plant

WASTEWATER
TREATMENT PLANT
Physical Location:
6400 East M-36
Hamburg, MI 48139
Phone: 810-231-8160
Fax: 810-231-8160
SEND ALL WWTP MAIL TO:
Hamburg Township DPW
10405 Merrill Road
P.O. Box 157
Hamburg, MI. 48139
Phone: 810-231-1000
Fax: 810-231-4295
Hours: Monday - Friday
8 a.m. to 5 p.m