Utilities Home | Utilities Dept. Site Map | Township Sewer System | Sewer GIS Map | Sewer Emergencies| Sewer Connection Applications | Sewer Connection Policies and Procedures | Grinder Pumps | Grinder Pump Alarms | Sewer Contractors | Roads and Road Maintenance | Municipal Utilities Committee | Livingston Community Water Authority | Portage-Base Lakes Sewer Authority

Last Updated
Thursday, April 28, 2011
Hamburg Township
Web Questions? E-mail: brichardson@hamburg.mi.us.

 

POLICIES AND PROCEDURES FOR SEWER EXTENSIONS

POLICY #5

The following policies and procedures shall apply for the extension and connection of sewer systems within Hamburg Township.

Application shall be made on a form developed by the Hamburg Township Municipal Utilities Committee and approved by the Hamburg Township Board of Trustees.

Fees shall be submitted in accordance with the approved Hamburg Township schedule of fees.

Upon receipt of a complete application and fees, the application shall be forwarded to the Township Engineer for an estimate of costs associated with the sewer extension. In review of the application, the Township Engineer shall take into consideration the following:

Application requirements:

SEWER EXTENSION DIAGRAM: Click here to view Sample Drawing .pdf file here to get an idea of what type of drawing is necessary.

1. Scaled drawing showing the bearings and distances of property lines. In the case of platted lots, a copy of the existing lot layout shall be provided.

2. A scaled plot plan showing the location of existing/proposed drive(s), utilities easements, building footprint(s), well location, existing utilities and significant natural features (wetlands, floodplain, drainage courses, streams and woodlands).

3. Main extensions shall be to the extent necessary to service the primary facility requesting service. In the event that the service lateral is within 30 feet of an existing drive, the main shall be extended beyond the existing drive to avoid future disturbance to the drive. Extensions may continue through to adjoining parcels at the request of the applicant.

Exemptions:

Desired exemptions from this policy may be granted upon written request submitted, and just cause shown by property owner, along with a scaled site plan for review and recommendation by the Hamburg Township Municipal Utilities Committee and Township Board approval.

 

 

 

SWIRL1UTILITIES DEPARTMENT
HAMBURG TOWNSHIP

10405 Merrill Road
P.O. Box 157
Hamburg, MI 48139
Hours: Monday-Friday
8:00 a.m. to 5:00 p.m.

UTILITIES COORDINATOR:
Brittany K. Campbell
E-mail: bcampbell@hamburg.mi.us

Waste Water Treatment Plant

WASTEWATER
TREATMENT PLANT
Physical Location:
6400 East M-36
Hamburg, MI 48139
Phone: 810-231-8160
Fax: 810-231-8160
SEND ALL WWTP MAIL TO:
Hamburg Township DPW
10405 Merrill Road
P.O. Box 157
Hamburg, MI. 48139
Phone: 810-231-1000
Fax: 810-231-4295
Hours: Monday - Friday
8 a.m. to 5 p.m